Motorists on Interstate 19 near Pima Mine Road should expect lane closures and possible delays Saturday, June 1.
Work is scheduled between 4 a.m. and 4 p.m.
During those hours, drivers should expect alternating lane closures on I-19 while crews install rumble strips and replace an overhead sign near the Pima Mine Road bridge.
Drivers should proceed through the work zone with caution, slow down and watch for construction personnel and equipment.
Schedules are subject to change based on weather and other unforeseen factors. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or go to azdot.gov/contact and select Projects from the drop-down menu. For real-time highway conditions statewide, visit ADOT's Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.